Project Information
| South Woodford |
10/06/2007 |
Hallway Refurbishment:
Preparation: Stripping material off wall; Pulling down old ceiling.
Installation: Insulation in ceiling; Rewire of hallway = lights x 3 and light sockets x 3; another 2 light sockets need to be moved to other side of door, Burglar alarm power socket and telephone connection; Light outside front door; Plasterboard on wall; Plasterboard on ceiling; Doors x 4; Radiator, skirting board around walls. |
| Tradesmans required: |
General Builder inc electrician |
| Time Scale |
2 weeks |
| Time Range |
ASAP |
| Price Estimate |
? £ |
|
View all active projects.
|