|
|
Projects
|
12/09/2011 |
|
Build bespoke wardrobes in 2 bedrooms. |
| Tradesmans required: |
Carpenters |
| Time Range: |
ASAP |
|
| east london |
26/09/2010 |
4 bed town house to be rewired in t&e, it is on 3 levels (2 beds & toilet) top 2 floors. (Lounge, kitchen toilet) grd floor.
Labour only price wanted either day work or price work.
Need to have a certificate on completion. |
| Tradesmans required: |
electrician |
| Time Scale: |
3-4 days |
| Time Range: |
4 oct |
|
| greenwich |
12/08/2010 |
|
Design and fix a kitchen , 3 bathrooms , repair a crackled floor and some doors etc which jobs need to come and check first. |
| Tradesmans required: |
Carpenter and Plumber |
| Time Scale: |
2 weeks and more |
| Time Range: |
asap |
| Price Estimate: |
3000 - 4000 £ |
|
| croydon |
22/07/2010 |
|
to replace panel and soffits and maybe beam behind on gable end of pitched roof on 4 storey block of flats and decorate rear soffits and replace wood where necessary. |
| Tradesmans required: |
carpenter/builder |
| Time Scale: |
up to week |
| Time Range: |
in month |
|
| peckham |
13/06/2010 |
SUMMARY OF 3 MAIN JOBS:
1. Replace normal in-built cupboard doors with 2 sliding doors. Add a shelf to top of cupboard. Put new hanging pole in.
2. Build a small wardrobe (W:29;H:76;D:17 inches)into a space in an un-used doorway.
3. Build a shelving unit with shelves and draw (W:14;H:76;D:17 inches)
I live in a studio flat and want to build some storage in an un-used hallway.
After the kitchen was opened up to the main room, the original entrance to the kitchen isn't used and is kept shut - this means there is a small unsused hallway Id like to convert into storage space.
1. There is already a cupboard in the hallway with a hanging pole and one shelf. I want an additionally shelf put in above existing shelf. The current pole removed and replaced (moved further down). Current doors replaced with sliding doors.
2. In the un-used door way (handle needs to be removed) a simple wardrobe created (that is secure but can be removed if necessary e.g. semi-permanent). The wardrobe would be the following dimensions- W:29;H:76;D:17 inches. It would include a shelf at the top and one hanging pole.
3. A shelving unit built in a space approximately these dimensions- W:14;H:76;D:17 inches. The unit would include at least 5 draws and 3-4 shelves with a door on the shelving part.
Photos of space can be provided |
| Tradesmans required: |
Carpenter |
| Time Scale: |
Few days |
| Time Range: |
Next month |
| Price Estimate: |
200 £ |
|
| Lille |
29/04/2010 |
I need to renovate completely a house in France. It is a old buiding, composed by two small houses 65m2+65m2.
I am looking for a skillet team, able to evaluate well the job to do, renovate from a A to Z the building, and perhaps supply the materials and products (boilers, cables, electric system etc...).
The carpentry is not to change, only the roof.
Contact me if the job interest you for more informations.
Only skilled workers. |
| Tradesmans required: |
builders |
| Time Range: |
summer |
| Price Estimate: |
7.5 £ |
|
| weybridge |
30/10/2009 |
|
Need leaking toilet fitting repaired. Also because of a lot of condensation in the flat we need a ventilator installed and some ceiling wallpaper that has become damp replaced. |
| Time Scale: |
from 06.12 -07.12.09 |
| Price Estimate: |
to discuss £ |
|
| FULHAM |
20/08/2007 |
|
REPAIR TERRACE ROOF BOTH FRONT AND BACK ADDITION. REPOINT CHIMNEY , NEW GUTTERING WITH DOWN PIPES IN PLASTIC. |
| Tradesmans required: |
ROOFERS |
| Time Range: |
ASAP |
|
| South Woodford |
10/06/2007 |
Garden - Cultivate, flatten and reseed + paving
Garden is approximately 24 feet x 13 feet. It currently has a gulley down the middle of the garden due to years of use. We are looking for someone to use a cultivator to dig up the whole area, flatten it out and then reseed it.
Also, need an area approx 5 feet x 7 feet paved (slabs already bought). |
| Tradesmans required: |
Landscaping/ Gardener |
| Time Scale: |
approx 2 days |
| Time Range: |
ASAP |
| Price Estimate: |
? £ |
|
| South Woodford |
10/06/2007 |
Hallway Refurbishment:
Preparation: Stripping material off wall; Pulling down old ceiling.
Installation: Insulation in ceiling; Rewire of hallway = lights x 3 and light sockets x 3; another 2 light sockets need to be moved to other side of door, Burglar alarm power socket and telephone connection; Light outside front door; Plasterboard on wall; Plasterboard on ceiling; Doors x 4; Radiator, skirting board around walls. |
| Tradesmans required: |
General Builder inc electrician |
| Time Scale: |
2 weeks |
| Time Range: |
ASAP |
| Price Estimate: |
? £ |
|
|